NRC Nickel Emissions Project
Vale
2015-2016
- Contract value of 2.6 million dollars
- 8-month duration, finishing 2 months ahead of schedule
- 516 grade 70 carbon steel, 304 stainless steel and 316 stainless steel flue
- Approximately 1 km in length (2 lines)
- Flue diameters from 5’ to 9’
- Scope included detailing, supplying material, fabricating, pacifying and cleaning stainless steel, as well as painting carbon steel components with high heat paint
E-Building Coleman Mine
Vale
2020
- 3-month duration, finishing on schedule
- Structural steel and plate
- Approximately 14’ x 44’ long
- Designed to have an exterior building finish with lifting capacity of 25 tons
- Scope included detailing, supplying material, fabricating and painting
- These prefabricated structural buildings have been used for electrical and boiler building at mine sites completed offsite and shipped to site for immediate use
E-Building Coleman Mine
Vale
2020
- 3-month duration, finishing on schedule
- Structural steel and plate
- Approximately 14’ x 44’ long
- Designed to have an exterior building finish with lifting capacity of 25 tons
- Scope included detailing, supplying material, fabricating and painting
- These prefabricated structural buildings have been used for electrical and boiler building at mine sites completed offsite and shipped to site for immediate use
Re-pulper Tanks and Platform Replacement
Glencore
2015
- 3-month duration, finishing on schedule
- Structural steel and plate
- Two tanks, approximately 10’ diameter by 12’ high
- 21-350w plate and structural steel
- Scope included detailing, supplying material, fabricating and painting per standards
Sample Towers
Minetech
2007
- 10-month duration, finishing on schedule
- Design/build a 4-level structure, approximately 75’ high
- Included structural steel building, chutes and conveyors
- Scope included detailing, supplying material, fabricating and painting per standards
Sample Towers
Minetech
2007
- 10-month duration, finishing on schedule
- Design/build a 4-level structure, approximately 75’ high
- Included structural steel building, chutes and conveyors
- Scope included detailing, supplying material, fabricating and painting per standards