Metex is located in the middle of one of the world’s great mining areas, and near to more than 20 mines, refineries and smelters. Because of this, we have extensive experience in designing, building and repairing heavy-duty steel structures such as chutes, ore passes and slag pots for the mining industry. We also have experience with a diverse range of other products, such as e-house structures, access platforms and ladders, vehicle chassis, pulp dryers, bridges and process equipment.

NRC Nickel Emissions Project
Vale
2015-2016

  • Contract value of 2.6 million dollars
  • 8-month duration, finishing 2 months ahead of schedule
  • 516 grade 70 carbon steel, 304 stainless steel and 316 stainless steel flue
  • Approximately 1 km in length (2 lines)
  • Flue diameters from 5’ to 9’
  • Scope included detailing, supplying material, fabricating, pacifying and cleaning stainless steel, as well as painting carbon steel components with high heat paint

E-Building Coleman Mine
Vale
2020

  • 3-month duration, finishing on schedule
  • Structural steel and plate
  • Approximately 14’ x 44’ long
  • Designed to have an exterior building finish with lifting capacity of 25 tons
  • Scope included detailing, supplying material, fabricating and painting
  • These prefabricated structural buildings have been used for electrical and boiler building at mine sites completed offsite and shipped to site for immediate use

E-Building Coleman Mine
Vale
2020

  • 3-month duration, finishing on schedule
  • Structural steel and plate
  • Approximately 14’ x 44’ long
  • Designed to have an exterior building finish with lifting capacity of 25 tons
  • Scope included detailing, supplying material, fabricating and painting
  • These prefabricated structural buildings have been used for electrical and boiler building at mine sites completed offsite and shipped to site for immediate use

Re-pulper Tanks and Platform Replacement
Glencore
2015

  • 3-month duration, finishing on schedule
  • Structural steel and plate
  • Two tanks, approximately 10’ diameter by 12’ high
  • 21-350w plate and structural steel
  • Scope included detailing, supplying material, fabricating and painting per standards

Sample Towers
Minetech
2007

  • 10-month duration, finishing on schedule
  • Design/build a 4-level structure, approximately 75’ high
  • Included structural steel building, chutes and conveyors
  • Scope included detailing, supplying material, fabricating and painting per standards

Sample Towers
Minetech
2007

  • 10-month duration, finishing on schedule
  • Design/build a 4-level structure, approximately 75’ high
  • Included structural steel building, chutes and conveyors
  • Scope included detailing, supplying material, fabricating and painting per standards